Godavari River Bridge

Nanded

Nanded

Nanded

Maharshtra

Maharshtra

Maharshtra

Construction of major bridge across Godavari river on Western Bypass to Nanded City on SH-248 at Ch.5/300 Taluq & District Nanded.

Features

Features

Features

  • Length of work executed 1320 M.

  • Pile foundation - 64 nos. of 1200 mm dia. approx. 16-17 M deep.

  • Superstructure - 8 spans each of 40 M long 10.5 M wide Box Girder. The superstructure was cast insitu on staging with a height of 20-25 M from bed level.

  • Approaches - 1000 M.

  • The work was executed in water depth of 6-7 M.

  • Length of work executed 1320 M.

  • Pile foundation - 64 nos. of 1200 mm dia. approx. 16-17 M deep.

  • Superstructure - 8 spans each of 40 M long 10.5 M wide Box Girder. The superstructure was cast insitu on staging with a height of 20-25 M from bed level.

  • Approaches - 1000 M.

  • The work was executed in water depth of 6-7 M.

  • Length of work executed 1320 M.

  • Pile foundation - 64 nos. of 1200 mm dia. approx. 16-17 M deep.

  • Superstructure - 8 spans each of 40 M long 10.5 M wide Box Girder. The superstructure was cast insitu on staging with a height of 20-25 M from bed level.

  • Approaches - 1000 M.

  • The work was executed in water depth of 6-7 M.

Client

Client

Client

The Executive Engineer Public Works Division, Sneha Nagar, Behind Govt. Rest House, Nanded – 431605.

Banka Constructions
205, Trade Corner,
Saki Naka Junction,
Andheri (East),
Mumbai - 400 072.

Banka Constructions
205, Trade Corner, Saki Naka Junction,
Andheri (East), Mumbai - 400 072.

Banka Constructions
205, Trade Corner,
Saki Naka Junction,
Andheri (East),
Mumbai - 400 072.