Loading...

MAHANADI River Bridge, Surajgarh

Including approach road across MAHANADI river at Km.1/2 on Surajgarh Nadigaon Road.

Client: THE EXECUTIVE ENGINEER, PUBLIC WORKS BRIDGE CONSTRUCTION DIVISION, RAIGARH - (CHHATTISGARH).
Salient Features:
  • Length of Bridge 1830 Meters & 8.40 Meters wide
  • Superstructure : Simply supported 45.75 Meters PSC box spans (40 Nos.)
  • Approach Road & Retaining Wall : 2100 Meters Surajgarh side & 1420 Meters Nadigaon side.
  • Foundation - Pile Foundations (1200 mm dia)- Piers 39 Piers x 4 nos x 16 M (Avg.) = 2496 Meters, - Abutments 2 nos x 9 x 20 M (Avg.) = 360 Meters, Total = 2856 Meters.
  • Expansion Joint - Strip Seal type (345 Rmtrs.).
  • Various minor structures were also executed on approach Roads.